 |
1. Drill proper sized hole, using rotation-only drilling
mode. Clean out hole with forced air. Complete hole preparation
with use of a brush and repeat cleaning with forced air (leave
no dust or slurry). |
 |
2. When starting new cartridge or new nozzle, dispense
and discard enough adhesive until uniform adhesive mix is achieved.
Insert the nozzle into the bottom of the screen and fill
screen completely full (use extension tube if needed to
reach bottom of screen). |
 |
3. Insert the filled screen completely into the hole
(subflush). |
 |
4. While holding the tab of the screen against the
wall, hand insert the selected rod slowly into the screen tube
with a slow twisting motion. Pull screen flush to face and coat
with adhesive. Wait for appropriate cure time before torquing fixture
into place. |