header

or go to the Advance Search
QuickMenu Save Document

 

 Screen Tubes

A7_C6

INSTALLATION INSTRUCTIONS
epcon_scrnselec1a.jpg (2743 bytes) 1. Drill proper sized hole, using rotation-only drilling mode. Clean out hole with forced air. Complete hole preparation with use of a brush and repeat cleaning with forced air (leave no dust or slurry).
epcon_scrnselec1b.jpg (3024 bytes) 2. When starting new cartridge or new nozzle, dispense and discard enough adhesive until uniform adhesive mix is achieved. Insert the nozzle into the bottom of the screen and fill screen completely full (use extension tube if needed to reach bottom of screen).
epcon_scrnselec1c.jpg (2866 bytes) 3. Insert the filled screen completely into the hole (subflush).
epcon_scrnselec1d.jpg (2850 bytes) 4. While holding the tab of the screen against the wall, hand insert the selected rod slowly into the screen tube with a slow twisting motion. Pull screen flush to face and coat with adhesive. Wait for appropriate cure time before torquing fixture into place.


ITW Red Head • 2171 Executive Drive • Addison, IL 60101 • 630-350-0370
copyright © 2009 Illinois Tool Works, Inc.